Site Map
|
About Us
|
Contact Us
|
Contact Me!
|
Home
Search
About Us
Solutions Overview
Intergraph CADWorx
Plant
P&ID
Steel
Equipment
Datasheets
Design Review
fieldPipe
Intergraph CAESAR II
Intergraph PV Elite
PV Elite
PV Fabricator
CodeCalc
Intergraph TANK
Press Room
Events
Current Offers: PV Elite Training
CADWorx University 2010
Insider Newsletter
CAESAR ll
PV Elite
Regional Training
CADWorx Plant Training DVD
Dealer Index
Dealer Support
Downloads
Discussion Forums
COADE Insider Blog
Interactive Help
Animated Tutorials
Latest Software
FAQ, Articles, Tips
Product Registration
Reference Books
ESL Update
Enhancement List
Operating System Compatibility
Miscellaneous Downloads
Mechanical Engineering News
Links
Intergraph Acquisition
Intergraph Analysis Solutions
Intergraph CAESAR II
Intergraph PV Elite
Intergraph TANK
»
Home
All Success Stories:
SubmitDate
First Name
Positions
Description
03/04/2010
Farrukh
Senior Design Engineer
"The detailed technical reference of CAESAR II and its comprehensive support saved us time and enhanced our productivity."
11/06/2009
Valdez
Piping Engineering Specialist at IMP
"Using both CADWorx and CAESAR II allowed our design and engineering teams to work in a coordinated manner and to produce complex deliverables."
09/10/2009
Kemal
Senior Piping Engineer at Petrolinvest
"CADWorx and CAESAR II allowed us to develop faster designs and isometric generation. We developed plant designs in only three months."
07/30/2009
Miroslav
Piping Team Leader at Capital Engineering
"The success with this project was convincing enough for the management to make a decision to use CADWorx as the firm's main design platform."
07/08/2009
John
Senior Mechanical Piping Designer at Wardrop, Tetra Tech Company
"CADWorx Plant model improved our communications and played an integral role in developing client's trust in us as a company"
02/26/2009
Gu
Project Engineer at Wuxi Huaguang Boiler Company
"CADWorx Plant Design Suite brought huge rewards and no risks compared to other applications."
01/23/2009
Wade
Technical Supervisor at Stantec, USA
"The ability to place piping restraints in CADWorx saved us numerous hours because our stress engineers did not have to manually input geometry and support locations within CAESAR II."
04/08/2008
Clint
Senior Designer at Erdman Anthony
"CADWorx and CAESAR II allowed us to minimize rework and to pre-order materials ahead of time, reducing the cost of materials due to potential price increases."
07/18/2006
Bob
CAD Manager at OPC
Because CADWorx PIPE had the ability to bi-directionally link to CAESAR II, OPC saved hundreds of engineering and design hours."
05/05/2003
Rob
Technical Engineer and CAD Manager at Advantica, UK
"We spent just two days creating the 3D pipe work model and then carried out the stress analysis whereas previously, it would have taken us around two weeks."
[Go Back]
Company Info
|
Products and Solutions
|
News
|
Events
|
Dealers
|
Site Map
|
About Us
|
Contact Us
|
Home
|
© Copyright 2010 COADE, Inc., now part of Intergraph Corporation
Powered by Nodus Solutions