07/13/2016 Kurita Japan CADWorx helps drive innovation and industry leadership at global water company.
06/11/2012 Metka Greece By integrating CADWorx for design with CAESAR II for analysis, METKA was able to provide the client with fast, accurate and complete isometric drawing.
04/02/2012 Grana y Peru The intelligent automation provided by CADWorx saved time, reducing man-hours approximately 60%, allowing them to complete the project on schedule while reducing costs.
12/06/2010 Donna CAD/Engineering Technical Instructor at Lee College “With CADWorx, we eliminated all annotation nightmares. When doing the piping plans and sections, CADWorx helped tremendously with identifying line numbers, elevations and equipment names.”
01/23/2009 Wade Technical Supervisor at Stantec, USA "The ability to place piping restraints in CADWorx saved us numerous hours because our stress engineers did not have to manually input geometry and support locations within CAESAR II."
12/18/2008 Tony Chief Piping and Layout Engineer at Bilfinger Berger Services, Australia "I want to use this as an opportunity to express my tremendous satisfaction with the program as it has saved a lot of time and frustration both in the design office and in the field."
09/17/2008 Dan Project Engineer at Holland Applied Technologies "We have found that designers who are familiar with AutoCAD can easily pick up and learn CADWorx, becoming highly productive in a short period of time.”
07/30/2008 Michael Project Engineer at Honeywell "I'd estimate that we are working 50% faster thanks to AutoCAD-based CADWorx software, it has shortened the cycle time and reduced engineering design time."
05/31/2007 Lee Anne CAD Manager at Petrofac LLC "We're very pleased with the overall results that we've had with CADWorx. It's an extraordinarily dependable product that more people need to know about."
06/01/2006 Manny Fina Design Group Fina Design Group, USA runs CADWorx P&ID with a SQL Server Database.
07/22/2005 Joe Drafting Manager at Toromont "Before we had CADWorx/PIPE, all of our BOMs had to be done through purchasing. What used to take us two days now takes probably ten minutes."
05/16/2005 Ronnie CAD Modeller at Hi-CAD, UK "Our client wanted 3D models of 130 existing sites and we needed a plant design system to help us meet the timescale."
02/11/2005 Alan Chevron Pipeline "One of the best decisions Chevron Pipe Line Company`s Technical Support team made this year regarding productivity was choosing COADE`s CADWorx PIPE."
06/01/2004 Presley Chief Designer Ultramar Diamond Shamrock creates multiple models and saves thousands of dollars with CADWorx.
06/12/2003 Jerry Piping Designer Ref-Chem, USA learns CADWorx and starts piping designs the very same day.
05/05/2003 Rob Technical Engineer and CAD Manager at Advantica, UK "We spent just two days creating the 3D pipe work model and then carried out the stress analysis whereas previously, it would have taken us around two weeks."