All Success Stories:

SubmitDateFirst NamePositionsDescription
01/06/2016 Shandong Provincial China Shandong Provincial Textile Design Institute succeeds on first 3D design effort with CADWorx.
08/31/2015 China Hi-Tech (Jiangxi) China China Hi-Tech (Jiangxi) Textile Design Institute Company, Ltd. saves time and improves accuracy with CADWorx on Indonesian viscose facility
04/01/2014 Black Cat Qatar Black Cat succeeds on Qatar project through CADWorx® accuracy and automation
02/01/2016 Gas Liquids Canada Gas Liquids Engineering cuts design time by almost half for gas processing facility
02/26/2016 Matomo South Africa Matomo Projects leverages CADWorx to avoid 75% in excess budgeted hours.
06/29/2016 Sino Pharmengin China Sino Pharmengin Succeeds With Intergraph CADWorx in Pharmaceutical Sector
07/13/2016 Kurita Japan CADWorx helps drive innovation and industry leadership at global water company.
10/30/2013 Empresas Canada Empresas Y&V achieves fast completion and design precision with CADWorx and CAESAR II
06/27/2013 FLSmidth Denmark FLSmidth sets new design efficiency standard with CADWorx on Kazakhstan project
03/28/2013 METKA Greece CADWorx and CAESAR II Aid Solo METKA Engineer in Producing Accurate Models
02/05/2013 Kahuna Design US Kahuna Design LLC leverages CADWorx to establish its business
05/10/2012 Prokon Engineering Turkey “We produced the greatest amount and quality of piping drawings and calculations in the company’s history."
08/01/2012 Chemical & Industrial Engineering US Chemical & Industrial Engineering Enhances Competitiveness with CADWorx and CAESAR II
06/11/2012 Metka Greece By integrating CADWorx for design with CAESAR II for analysis, METKA was able to provide the client with fast, accurate and complete isometric drawing.
04/02/2012 Grana y Peru The intelligent automation provided by CADWorx saved time, reducing man-hours approximately 60%, allowing them to complete the project on schedule while reducing costs.
03/05/2012 Tata India "A major benefit of CADWorx was avoiding surprises that detected later might prove costly later."
10/04/2011 Michael Director of Virtual Design & Construction "CADWorx helped us avoid all the project challenges associated with historic construction such as constructability issues, coordination problems, fabrication errors, and others"
04/12/2011 Martin Lead/Senior Piping Designer “The fabrication deliverables were produced with 100% accuracy therefore drastically reducing rework.”
12/06/2010 Donna CAD/Engineering Technical Instructor at Lee College “With CADWorx, we eliminated all annotation nightmares. When doing the piping plans and sections, CADWorx helped tremendously with identifying line numbers, elevations and equipment names.”
11/04/2010 Kapil Designer at Fichtner “CADWorx Plant allowed us to view the 3D model of the piping system beam, column, equipment, and pipe racks. We were able to save time and man-hours using technical reviews built into the CADWorx.”
10/29/2010 Dmitry Piping Engineer at KBR, Moscow "CADWorx Plant Design Suite is a very intuitive and easy to use, and CADWorx combined with KBR specialists are a magic wand for being able to create such a quality project as we did."
09/01/2010 Thiagarajan CEO at Mech-Tech Projects "CADWorx helped us reduce engineering man-hours by 50% while eliminating the need for independent support modules for pipe support or structural design."
06/02/2010 Arunachalam CEO at Mech-Tech "The links between plant design and analysis solutions saved us time and money."
04/05/2010 Viswanathan Assistant Chief Engineer at Fichtner Consulting "CADWorx helped us resolve our project challenges while ISOGEN was used to produce accurate isometric drawings."
02/02/2010 Daniel Mechanical Engineer at Mekinvest "CADWorx tools allowed us to teach our students modern plant design tools quickly and efficiently."
10/09/2009 Juan Carlos Project Manager for the Copa Macoya Plant Project "CADWorx Plant Design Suite allowed us to easily generate and use the project data including ISOMETRICS, list of materials, 3D model."
11/06/2009 Valdez Piping Engineering Specialist at IMP "Using both CADWorx and CAESAR II allowed our design and engineering teams to work in a coordinated manner and to produce complex deliverables."
09/10/2009 Kemal Senior Piping Engineer at Petrolinvest "CADWorx and CAESAR II allowed us to develop faster designs and isometric generation. We developed plant designs in only three months."
07/30/2009 Miroslav Piping Team Leader at Capital Engineering "The success with this project was convincing enough for the management to make a decision to use CADWorx as the firm's main design platform."
05/04/2009 Boro Production Manager, Collaborated Engineering Design Office "CADWorx Plant Professional gave us complete control over our project, ensuring smooth project flow in 3D."
07/08/2009 John Senior Mechanical Piping Designer at Wardrop, Tetra Tech Company "CADWorx Plant model improved our communications and played an integral role in developing client's trust in us as a company"
02/26/2009 Gu Project Engineer at Wuxi Huaguang Boiler Company "CADWorx Plant Design Suite brought huge rewards and no risks compared to other applications."
01/23/2009 Wade Technical Supervisor at Stantec, USA "The ability to place piping restraints in CADWorx saved us numerous hours because our stress engineers did not have to manually input geometry and support locations within CAESAR II."
12/18/2008 Tony Chief Piping and Layout Engineer at Bilfinger Berger Services, Australia "I want to use this as an opportunity to express my tremendous satisfaction with the program as it has saved a lot of time and frustration both in the design office and in the field."
12/08/2008 Keith President of PLC "I've been using AutoCAD for 20 years and am very fast but there's no way that I can come close to the speed that even my less experienced designers can achieve with CADWorx."
09/17/2008 Dan Project Engineer at Holland Applied Technologies "We have found that designers who are familiar with AutoCAD can easily pick up and learn CADWorx, becoming highly productive in a short period of time.”
07/30/2008 Michael Project Engineer at Honeywell "I'd estimate that we are working 50% faster thanks to AutoCAD-based CADWorx software, it has shortened the cycle time and reduced engineering design time."
04/08/2008 Clint Senior Designer at Erdman Anthony "CADWorx and CAESAR II allowed us to minimize rework and to pre-order materials ahead of time, reducing the cost of materials due to potential price increases."
05/31/2007 Lee Anne CAD Manager at Petrofac LLC "We're very pleased with the overall results that we've had with CADWorx. It's an extraordinarily dependable product that more people need to know about."
07/18/2006 Bob CAD Manager at OPC Because CADWorx PIPE had the ability to bi-directionally link to CAESAR II, OPC saved hundreds of engineering and design hours."
06/01/2006 Manny Fina Design Group Fina Design Group, USA runs CADWorx P&ID with a SQL Server Database.
07/22/2005 Joe Drafting Manager at Toromont "Before we had CADWorx/PIPE, all of our BOMs had to be done through purchasing. What used to take us two days now takes probably ten minutes."
05/16/2005 Ronnie CAD Modeller at Hi-CAD, UK "Our client wanted 3D models of 130 existing sites and we needed a plant design system to help us meet the timescale."
02/11/2005 Alan Chevron Pipeline "One of the best decisions Chevron Pipe Line Company`s Technical Support team made this year regarding productivity was choosing COADE`s CADWorx PIPE."
06/01/2004 Presley Chief Designer Ultramar Diamond Shamrock creates multiple models and saves thousands of dollars with CADWorx.
05/20/2004 Craig Engineering Manager at Tippett & Gee Tippett & Gee, USA completes job in time and under budget using CADWorx.
01/05/2004 unknown Piping Design Pearl Development, USA uses CADWorx fieldPipe to design post extraction process units.
06/12/2003 Jerry Piping Designer Ref-Chem, USA learns CADWorx and starts piping designs the very same day.
05/05/2003 Rob Technical Engineer and CAD Manager at Advantica, UK "We spent just two days creating the 3D pipe work model and then carried out the stress analysis whereas previously, it would have taken us around two weeks."

[Go Back]